skip to main content

Project Scope of Work

John Pearl Elementary School

 

  • Vinyl Asbestos Floor Tile Abatement
    Replace all remaining asbestos floor tile and vinyl cove base. Bulk scrape all existing mastic. Furnish and install new vinyl composite tile, 6" rubber cove base. Proper floor prep prior to installing new flooring shall also be required. Work shall be completed in strict accordance with NYSDOL ICR 56.

  • Sidewalk, curb and asphalt play area
    The following areas are in need of upgrades. Replace asphalt play area at the rear of the school. Replace the curbing and sidewalks along the front bus loop and install a new ADA walk to the existing play area. Additionally install a new handicapped ramp at the main entrance to the school. I understand one was removed b/c of skateboarders but the new design will prevent unwanted use of the railings during non school hours.

  • Playground Replacement
    Installation of a new grade appropriate play ground structure for 4th-5th graders. Work shall include, excavation, drainage, play structure and ADA compliant safety surface. Provide ADA walkway to new structure.

  • Refurbishment of Library to create Media Center
    Convert existing library into a multi functional media center intended to expand students creativity where they can gain access to information and resources. The term used Is a "shared learning space". This will involve new furniture including flexible seating options, and shelving, ceiling and lighting replacement, replacement of existing flooring, the introduction of new A/C, electrical, demolition, technology a new circulation desk, finishes and carpentry. Open wall between the existing library and the computer lab with a glass partition which will improve line of site and allow for the spaces to feel larger than they are. repurpose some of the casework that may still be in relatively good condition.

  • Exterior Masonry 
    The small entrance steps at the gymnasium entrance are in need of replacement. Replace, steps, and knee walls. Replace in kind as part of the scope.

  • HVAC reconstruction
    Replacement and upgrade of misc. pneumatic controlled H&V equipment to DDC controlled. Convectors, fan coil units, convectors, mixing valves etc.

  • Replace Existing underground Electric Service
    Replace existing incoming Primary lines from street to existing pad mounted transformer.